Garment BOM and production planning.
Build size- and colour-wise BOMs, plan each process on a visual canvas, and see budget against planned cost before you spend. Then raise purchase orders straight from the BOM and receive the material lot by lot.
Every trim, exactly right.
Size-wise trims
Zippers, buttons and threads follow the exact garment size, so XS and XXL never share one flat average.
Colour-wise materials
Map fabric and trims to colourways. Only the sizes an item is mapped to are counted.
Route costing
Every stage carries its own input, output and cost, so the cost per piece builds up as you plan.
From BOM to purchase order.
Build the BOM
Add material lines for an order or style, with average consumption.
Scope by attribute
Choose which size and colour each material is used on.
Approve
Approved lines stay safe when the BOM is saved again.
Plan the route
Draw the process stages and set input, output and loss.
Buy from the BOM
Pick materials in the purchase order. Quantities respect the plan.
Budget against plan, before you spend.
Every stage has its own input, output and process cost. The canvas adds them up, so you see the cost per piece and the margin while you are still planning. Work sent outside is then handled in job work, and the real cost of each order is tracked in costing and order profit. New to planning? Read our garment production planning guide.
- Live budget versus planned cost
- Input and output quantity for each process
- Planning quantity refreshes when order quantity changes
| Material | Avg per piece | Required |
|---|---|---|
| Main fabric | 1.25 m | 750 m |
| Zipper 18 cm | 1 pcs | 600 pcs |
| Zipper 22 cm | — | not used |
| Button set | 5 pcs | 3,000 pcs |
| Care label | 1 pcs | 600 pcs |
Less typing. Fewer mistakes.
BOM approval
Send the BOM for approval. Lines that are already approved are kept when the BOM is saved again.
Import from another order
Copy a BOM from an earlier order. You can bring its planning along too.
BOM print
Print a clean BOM for the factory, the buyer or the purchase team.
Process routing designer
Build the route as cards: raw material, processing stages and final output.
Route approval
Approve the route for the scope you choose, so planning stays under control.
Output master
Define the outputs of each production stage once and reuse them across routes.
Buy what the order needs, and no more.
Create a purchase order by picking materials straight from the BOM. Approval, templates and quantity guards keep buying under control. See purchase and GRN for the full buying flow.
- PO approval workflow and reusable PO templates
- A line cannot drop below the quantity already received
- Cancelled PO releases only the unreceived balance back to the BOM

Questions about BOM and planning
What is attribute-driven BOM?
Size, colour and other attributes you choose decide which material is used and how much. XS and XXL do not share one flat average. New to BOMs? Read the garment BOM guide.
Can I reuse a BOM?
Yes. Import a BOM from another order. You can import its planning as well.
Does the plan change when the order quantity changes?
Yes. Planning quantities refresh when the order quantity changes.
Can I stop over-buying?
Yes. Purchase orders are raised from the BOM, with guards on quantity and approval.
This module is part of Karpan ERP for garment manufacturing and textile manufacturing.
Plan your next order on the canvas.
Bring one style. We will build its BOM by size and colour and lay out the process route on the canvas.