Production Control TowerLive data

Where is the work stuck today?

One screen for the shop floor: what was issued, received and made good, where work is waiting, how long it has waited, and which work orders are late. Click any number to see the list behind it.

Plans & pricing
  • 7 tiles vs last period
  • 4 WIP age bands
  • Every number clickable
karpan / reports / production-dashboardLive
Issued4,860
Received3,920
Good3,710
WIP now2,240
Cutting420
Stitching1,200
Washing310
Finishing180
Packing130
Bottleneck: Stitching1,200 pcs waiting 7+ days · click any number
sample data
The morning meeting

Stop asking each department.

Without it
  1. Call each line supervisor for counts
  2. Add up WIP from registers
  3. Find the late work order after the buyer asks
In Karpan
  1. Open one page with this week’s numbers
  2. See the slowest stage named in plain words
  3. Act on the list of late, stuck and rework items
Read it top to bottom

Big picture first, then the detail.

Pick a period, filter by order, buyer, department or in-house vs job work, and read down the page.

  1. 01
    Seven tiles

    Live and period numbers with trend lines and the change from last period.

  2. 02
    Stage pipeline

    Stages in your route order, with the bottleneck named in one sentence.

  3. 03
    WIP ageing

    Work per department in 0-3, 4-7, 8-15 and 15+ day bands.

  4. 04
    Needs attention

    Late work orders, stuck WIP, reject over target and rework waiting.

  5. 05
    Click any number

    A side drawer shows the list, totals and buttons to open the order or the receipt.

WIP by age, per departmentsample data
Department0-3 d4-7 d8-15 d15+ d
Stitching420310860340
Washing18090400
Job work: printing02501500
  • LateWO-2214 Formal Shirt: due 3 days ago
  • Rework60 pieces waiting for alteration
Where the numbers come from

Real entries, not a separate sheet.

  • Your own entries

    Issues, receipts, the OK / alteration / reject split and the alteration loop.

  • Order heat grid

    Each order opens into a day × process grid of good pieces, alterations and rejects.

  • Share and ask

    Filters stay in the page link, Excel and A4 print, and Ask AI about the same filters.

Questions

Questions about the control tower

Where do the numbers come from?

From the production entries in Karpan: issues, receipts, quality splits and alterations.

Can I see only job work?

Yes. Filter in-house or job work, or one department, order or buyer.

Can I share a view?

Yes. The filters are kept in the page link.

Can I print it?

Yes. Export to Excel or print on A4.

Free 30-minute demo

See where your WIP is stuck.

I want to seelot-wise stock in actionhow the visual BOM worksorder profit and loss

We walk you through the control tower on sample orders and show how one click finds the late work order.